52 Princess Street in Manchester is a stunning Grade II listed building, which was originally a cotton mill.

K2 Under Armour Manchester 5

The Brief

52 Princess Street in Manchester is a stunning Grade II listed building, which was originally a cotton mill. Paul McCann, the landlord, had previously used K2 and are his preferred supplier.

The building had been lovingly restored to retain all the original features and character with exposed brickwork, timber and cast iron steel beams and columns. As a Grade II listed building, there were many issues and problems which needed to be overcome. Not least the positioning and location of the external condensing unit.

Partsrepair

Project Type

Installation

Installation

Overview

working in a Grade II listed building

Maintenance

Project Solutions

Mitsubishi 3-pipe VRF heat recovery system

The Solution

With Paul’s insistence on maintaining the unique atmosphere and look of the building, K2 carefully prepared a scheme which would fit in with his vision and be sympathetic to the original character. The crux of the scheme revolved around exposed steel air-conditioning ducted fan coils and galvanised tray and ductwork – all of which matched the character perfectly.

Once completely happy with the proposal, the works were commissioned with Mitsubishi being chosen as the preferred manufacturer. The scheme utilised the latest state of the art 3-pipe VRF heat recovery system. The issue with the condensing unit was resolved by sitting it in the basement car park.

The Result

The 375Kg unit was physically taller than the ceiling space available, but with some crafty design and planning, building works were completed and a specialist, bespoke duct hood was designed and manufactured.

Working closely with the interior fit-out company, and sensitive to the fact that the rest of the building was occupied, the works were completed on schedule and to exact budget to the complete satisfaction of Paul and Under Armour – the new tenants.

Speak to us
5.0
# # # # #
“They’re reliable and they’re personable, we’ve built a personal friendship and I’ve got to know them really well.”
Sid Munshi - Developer
Successful projects

Related case studies

K2 Beefelo 01 min
01 / 03

Beefalo Installation & Maintenance

With 20 years in the development projects, Sid Munshi knows exactly what he wants from his suppliers. "I build some serious projects,"he says, I'm trusted by the community and everyone knows that my suppliers are the best and that anyone who comes through me never causes any issues."

So, when Chef Bryan Yuce sought to open his new steak restaurant in Bolton—Beefalo Meat House—Sid turned to K2 Healing and Cooling Solutions. With our reliable heating and air conditioning systems and dedication to quality, we were the perfect fit for this ambitious project.

Read Case Study
Al solicitors min
02 / 03

AI Solicitors - Installation & Maintenance

When letting office space, making it as appealing as possible is crucial. The more modern and comfortable your serviced offices are, the higher your occupancy rates, and the more you can charge. Plus, if your own team shares the space, it’s important they benefit from a pleasant working environment, too.

That’s exactly what Bolton Accident Injury Solicitors had in mind when completing their 3-floor new build. Instead of separate radiators and air conditioning units, they wanted a modern, integrated heating and cooling system to ensure comfort throughout the building. K2 was brought on board to provide a solution that met their specific needs. Our team delivered an efficient and seamless air conditioning installation.

Read Case Study
KBS min
03 / 03

KBS Corporate - Installation & Maintenance

Since becoming the owner of a new three-story office building in 2016, KBS initially installed air conditioning only in the communal areas, leaving the meeting rooms with standard heating. This setup worked well for keeping the offices warm, but when summer arrived, it became apparent that it was not effective.

As the sun streamed through the windows, staff quickly found themselves overheating, prompting the KBS team to realise the need for a more effective cooling solution.

KBS turned to K2 Healing and Cooling Solutions for installation and maintenance. Our expert team designed and implemented a tailored air conditioning system for optimal cooling throughout the office. With our ongoing maintenance support, KBS now enjoys a consistently comfortable and productive work environment.

Read Case Study
Contact bg

Got a question? Get in touch with us today and we'll be happy to help.

#

Bolton (Head Office): 116-118 Long Causeway, Farnworth, Bolton, BL4 9BL

Tel: 01204 361171

#

Manchester Office: 76 King Street, Manchester, M2 4NH

Tel: 0800 107 5097 |

Tel: 0161 804 4561

#

…or email us on

Ready to get a quote?