Get A Quote
phone-icon Ready to get a quote?
K2 Eden Point 01 min

Case study: Eden Point

Eden Point Installation & Maintenance

Bridge Properties' Eden Point development needed bringing up to date. While the existing cooling systems were working, they weren't working well. And they didn't look the part.

K2 Eden Point 25 K2 Eden Point 26 K2 Eden Point 14 K2 Eden Point 37 K2 Eden Point 47 K2 Eden Point 48

The Brief

Bridge Properties' Eden Point development needed bringing up to date. While the existing cooling systems were working, they weren't working well. And they didn't look the part.

In order to attract new tenants to their unique South Manchester office space, Bridge Properties would need to remodel and refurbish Eden Point - removing a suspended ceiling and improving the look of the property.

If that improved look also included improved efficiency of the office's cooling systems, so much the better.

Partsrepair

Project Type

Installation & Maintenance

Installation

Overview

Ongoing maintenance contract

Maintenance

Project Solutions

Ducted fan coil units across three floors. Installation of chiller systems. 12 month maintenance plan

#

The Solution

Bridge Properties' Paul McCann knew exactly what he needed, as you'd expect from someone with experience in property management and development: "A lot of our existing kit needed to change. It was more a cosmetic issue than a performance one, but what we had really wasn't fit for purpose. We needed to strip out what was there and replace it with new, rigid pipework."

And where would Paul turn to get exactly what he needed, He already knew: "We'd used K2 before, following a glowing word-of-mouth recommendation back in 2010. We've continued to use them ever since."

#

The Result

Improved cosmetics, improved performance.

New, clean pipework has really added to Eden Point's contemporary feel and turned it into an attractive prospect for businesses interested in an office upgrade. But it's not an improvement that's just skin deep.

Rigid pipework has also improved the sound qualities of the offices, which combines with the increased efficiency and effectiveness of the cooling units to create a far more pleasant working environment.

Speak to us
5.0
# # # # #
“I’d definitely recommend K2. They’re reliable, and the follow-up work is good as well. The last thing you want on a large project is poor aftercare, and with K2 that’s not a problem.”
Paul McCann - Director
Successful projects

Related case studies

Al solicitors min
01 / 03

AI Solicitors - Installation & Maintenance

When letting office space, making it as appealing as possible is crucial. The more modern and comfortable your serviced offices are, the higher your occupancy rates, and the more you can charge. Plus, if your own team shares the space, it’s important they benefit from a pleasant working environment, too.

That’s exactly what Bolton Accident Injury Solicitors had in mind when completing their 3-floor new build. Instead of separate radiators and air conditioning units, they wanted a modern, integrated heating and cooling system to ensure comfort throughout the building. K2 was brought on board to provide a solution that met their specific needs. Our team delivered an efficient and seamless air conditioning installation.

Read Case Study
KBS min
02 / 03

KBS Corporate - Installation & Maintenance

Since becoming the owner of a new three-story office building in 2016, KBS initially installed air conditioning only in the communal areas, leaving the meeting rooms with standard heating. This setup worked well for keeping the offices warm, but when summer arrived, it became apparent that it was not effective.

As the sun streamed through the windows, staff quickly found themselves overheating, prompting the KBS team to realise the need for a more effective cooling solution.

KBS turned to K2 Healing and Cooling Solutions for installation and maintenance. Our expert team designed and implemented a tailored air conditioning system for optimal cooling throughout the office. With our ongoing maintenance support, KBS now enjoys a consistently comfortable and productive work environment.

Read Case Study
Princess Under Armour min
03 / 03

Princess Street - Under Armour

The building had been lovingly restored to retain all the original features and character with exposed brickwork, timber and cast iron steel beams and columns. As a Grade II listed building, there were many issues and problems which needed to be overcome. Not least the positioning and location of the external condensing unit.

Read Case Study
Contact bg

Got a question? Get in touch with us today and we'll be happy to help.

#

Bolton (Head Office): 116-118 Long Causeway, Farnworth, Bolton, BL4 9BL

Tel: 01204 361171

#

Manchester Office: 76 King Street, Manchester, M2 4NH

Tel: 0800 107 5097 |

Tel: 0161 804 4561

#

…or email us on

Ready to get a quote?